Filter
Industry & Category
Country
- (3)
- (2)
- (1)
- (1)
- (1)
- (2)
- (2)
- (1)
- (2)
- (1)
- (3)
- (1)
- (1)
- (2)
- (1)
- (1)
- (3)
- (4)
- (1)
Brand
- (3)
- (4)
- (2)
- (4)
- (2)
- (1)
- (1)
- (8)
- (1)
- (4)
- (1)
- (2)
Model
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (2)
- (1)
- (2)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
- (1)
Condition
- (2)
- (5)
- (26)
Year
- (4)
- (3)
- (1)
- (4)
- (7)
- (4)
- (5)
- (2)
- (2)
- (1)
Price
Hours
mini digger for sale
We’ve found 33 products you may like
Core Parameter Verification Protocol
3 layers verification needs to be conducted and the fund will be released only after the process is completed in the case of mini digger procurement. Acceptable leakage: No visible leakage at cylinder rods, the pump casing and no crimping leakage in leakage hose.
Gauge measurement of under wear- depth, calibrated. Elongation in the pitch of the track at a point exceeding 2% of OEM is considered as end of life. Reason for disqualification will be excessive roller flange wear (over 10mm), pointing sprocket teeth and flat spots on idler. The replacement cost is on average: 30% of purchase cost of machines. If it is required, then the measurement log with the signature of the inspector should be included.

ECU verification data – engine hours. This is not enough – dashboard meter reading only. Compare with service interval data, oil analysis data, oil change logs, etc. When the error is more than 15%, this indicates the risk of tampering because the meter and ECU will show different hours.

Model Comparison Matrix
The flow rates of different brands are different by 15-20%. COLDIRE Availability Split: There is a split for parts leadtime between the Japanese OEMs (PC35MR/ SK75/ U35) and the European/African market. Depending on the hydraulic pump, there is a premium price for western brands – 303.5E. For the Asian equivalent – 1.0x.
Year, Hours, Condition & Price can be used to filter, on this page. Important when selecting to match wear stage with a duty ceiling and expected length of duty cycle.
Acceptance Baseline Standards
Pre-shipment gate: hydraulic test passed by third party load tests. Remaning useful life (under-carriage) minimum 1500 running hours by measurement of wear. The level of authenticity is validated by the sum of executed engine hours, on a digital service history report or by independent ECU audit.

No exceptions. Non-conforming units continue to be inventory risk to seller and Liability Exposure to buyer.

Data sources for the table above:https://www.ironplanet.com/return-policy



